Here is week five of the Moody Master Bathroom Remodel.
Welcome to week five of the One Room Challenge (ORC) for Spring 2019!
ORC is a challenge for several designers and bloggers to makeover one room in six weeks. We are in week five and the end is in site! This week we were able to install the bathtub, shower door, toilet, shiplap behind the toilet, water closet window trim, and some accessories. We also did lots of caulking. Ahh I hate caulking, especially when it’s on dark paint.
Here is the bathtub ready to be enjoyed!
The shower is completely tiled. The shower door and faucet have been installed.
I shiplapped behind the toilet. I left it as is to determine if I wanted to go any higher with the planks. We also installed the new toilet and now we can “flush with confidence!” Isn’t it fun to read the verbiage on toilet boxes? We also installed the toilet paper holder. So now the toilet situation is back in business.
Next week we finish up with final touches and accessories. I have to admit the last 5 – 10% of a project can be the most challenging for me.

OMG! I loveeee it so much! How I wish I can remodel mine too into something like that!
Kyra Rodriguez recently posted…Best Tile Designs that Can Brighten Up Homes
Thanks Kyra!
This is a good design idea for a small bathroom. Pictures look great!
Thanks Aziz!
Great post. Thank you for sharing.
Thanks Samira!
Stunning bathroom, Tiffany. Yes, I have been browsing and reading your interior blog series and I see the lovely changes. The unique interior of the bathtub room, the palette, and most especially the window – I like it. Looking forward to the next post.
Hi Kalia,
Thanks so much!
Simple love this, please keep us posted.